April 7–11: Utilities will be flushing debris from the system. You may see water running during this time, but please don’t install pumps yet—there will still be a lot of silt and sediment in the ditches.
April 14: Headgates open, and our team will begin balancing the system.
April 15: Residents can begin installing pumps and getting ready for irrigation season!